MADD methodology applied to Chile's National Electricity System (SEN).
BESS LFP 4h — Ex-ante emission reductions (MADD §5.4). Analysis 2024 + 2025.
BESS LFP 4h — Ex-ante emission reductions (MADD §5.4). Analysis 2024 + 2025.
BESS LFP 5h — Ex-ante emission reductions (MADD §5.4). Analysis 2024 + 2025.
BESS LFP 4h — Ex-ante emission reductions (MADD §5.4). Analysis 2024 + 2025.
PV+BESS LFP 4h (Atacama) — Ex-ante emission reductions (MADD §5.4). Analysis 2024 + 2025.
Stand-alone BESS LFP 4h (Atacama) — Ex-ante emission reductions (MADD §5.4). Analysis 2024 + 2025.
BESS Li-ion 4.6h (Antofagasta, COD Apr 2028) — Ex-ante emission reductions (MADD §5.4). Analysis 2024 + 2025 as historical proxy.
Emission reduction (RED) calculation for the currently operating BESS fleet in the SEN, based on real CEN data.
Consolidated view of the SEN BESS portfolio — installed capacity, operations and avoided emissions by facility.